PHASE 1 — CONNECTIONS 0.0–1.0 sec: Start exactly from Frame 1. All connection l
PHASE 1 — CONNECTIONS 0.0–1.0 sec: Start exactly from Frame 1. All connection lines and arrows are completely invisible. No arrows or lines are visible anywhere. 1.0–7.5 sec: Gradually draw all connections in a random, non-sequential order. The connections do NOT have to appear strictly one at a time. Several independent connections MAY be drawn simultaneously or partially overlap in their a...
Create yours on Doitong
Free to start · Generate videos and images with AI in seconds